The Brief
Recalls, FDA and USDA actions, and standards changes, briefed with what each one means for your facility.
Filtered by tag: traceability
ClearSep 22, 2026
By the Time FDA Names the Food, Your Lot Is Gone
FDA closed a 14-case E. coli O157:H7 investigation this summer. Its note says the product was already beyond shelf life by the time FDA identified romaine lettuce as the likely source, and its public table names no grower or processor. Eight more investigations are open right now with the food listed as Not Yet Identified, covering 569 confirmed cases. An outbreak can close while you read the same table as everyone else. The signals that reach you first are inside your own plant.
6 min
Jun 29, 2026
Your Supplier's Other Customer Had an Outbreak. Nobody Told You.
Nara Organics and ByHeart never shared a label, a plant, or a brand. They shared a milk supplier. Seven months after ByHeart's infant-botulism recall, the same supplier's milk turned up in a second formula tied to the same illness, and the supplier's customer list to FDA never showed the link. The recall isn't the lesson. The blind spot is. Shared-supplier risk hides from one-up, one-down traceability, and most supplier agreements never account for it.
5 min
Mar 10, 2026
FSMA 204 Delayed to 2028: What Food Manufacturers Should Do Now
FSMA 204 got pushed to July 2028, but the requirements didn't budge. You still need lot-level traceability data at every critical tracking event, and the FDA still expects a complete electronic file within 24 hours of asking. The facilities that use this window to prepare will be fine. The ones that wait won't be.
7 min
Run a food safety program? See how Beacon keeps it audit-ready.
See Beacon in 20 minutes